Home › Resource Center › Buying and selling an airplane

Pre-buy logbook review: what to check before you buy

Updated November 19, 2026 · About an 8-minute read

The airplane can look perfect and still have a records problem that costs thousands to fix. The FAA doesn't define a "pre-buy inspection"; what gets checked is whatever you and your mechanic agree on. But the logbooks are where most surprises are found, and the FAA rules tell you exactly what they're supposed to contain. Here's what to look for, with the FAA source for each point at the bottom.

General information for type-certificated aircraft, not legal advice. Have an A&P or IA who knows the type review the records and the airplane.

Before you travel: ask for scans

Ask the seller for a complete scan of every logbook (airframe, each engine, each propeller), the AD status list, every Form 337, and the current weight and balance. Reviewing them first can save you a trip.

The FAA checks, title and closing paperwork around the pre-buy are in buying your first airplane: the process, step by step.

1. Are all the logbooks there, back to new?

Look for every logbook since the aircraft was new, with no missing years. A gap is more than an inconvenience: FAA guidance (AC 43-9D) warns that insufficient or nonexistent records may make the Airworthiness Certificate invalid. It also says estimated times can't be used where life-limited parts or AD compliance are involved: life-limited parts need the actual records, and AD compliance without records may have to be re-established by inspection or by doing the AD again. If books are missing, see our guide on lost aircraft logbooks for what rebuilding them involves.

2. Is the annual current, and was it done right?

  • Unless the aircraft is on a progressive or other approved inspection program (14 CFR 91.409(c) through (f)), it must have had an annual inspection within the preceding 12 calendar months, approved for return to service by a person authorized under 14 CFR 43.7 (91.409(a)). In practice that's usually a mechanic with an Inspection Authorization (14 CFR 65.95).
  • The entry should show the type and extent of the inspection, the date and the aircraft's total time, the inspector's signature, certificate number and kind of certificate, and the statement that the aircraft was found airworthy (14 CFR 43.11(a)). Our annual inspection entry guide covers this in detail.
  • If the last annual ended with a list of discrepancies instead of an airworthy statement, ask to see that list and the entries showing each item was fixed (43.11(b); 91.417(b)(3)).

3. Is every AD accounted for?

The records must show the current status of each applicable AD: number, revision date, method of compliance and, for recurring ADs, when the next action is due (14 CFR 91.417(a)(2)(v)). Get your own list of ADs for the airframe, engine, propeller and installed appliances from the FAA's Dynamic Regulatory System (drs.faa.gov), compare it with the seller's list, and check that each one is backed by a logbook entry. Watch for recurring ADs that are close to due. More in our AD compliance guide.

4. Major repairs, alterations and damage history

  • The records must include a copy of the Form 337 for each major alteration (91.417(a)(2)(vi)). Major repairs are normally on a 337 too, though a repair station may document one on its work order instead (14 CFR Part 43, Appendix B).
  • Order the aircraft's file from the FAA Aircraft Registry ($10 on CD-ROM) and compare the 337s the FAA has with the ones in the logbooks. See getting your FAA records and 337s.
  • Check that the weight and balance reflects the alterations. FAA guidance says weight and balance changes from a 337 should be entered in the weight and balance records with the date, signature and a reference to the form (AC 43.9-1G).
  • Since October 2, 2006, an aircraft may only be altered under a supplemental type certificate (STC) if the owner holds the STC or has the holder's written permission (14 CFR 91.403(d)). For STCs installed since then, ask whether the permission letter was kept; the rule doesn't require keeping it, and older installations won't have one.
  • Search the NTSB's CAROL database by registration number for any accident or incident reports. It covers aviation events from 1962 on.

5. Engine and propeller times

  • Find the engine's total time and its time since last overhaul, and who did the overhaul. In a required entry, "overhauled" and "rebuilt" have specific meanings (14 CFR 43.2). Only an engine rebuilt to zero time by its manufacturer or an agency the manufacturer approves may start a new record without its previous history (14 CFR 91.421).
  • Compare those times with the manufacturer's recommended time between overhauls (TBO), in both hours and calendar years: Lycoming publishes its TBOs in Service Instruction 1009 and Continental in Service Information Letter SIL98-9. The FAA's Chief Counsel has said a manufacturer's recommended TBO isn't mandatory for an aircraft operated under Part 91 unless it's in the FAA-approved Airworthiness Limitations section or required by an AD or other regulation (2019 legal interpretation), but it tells you what's coming. Our engine times guide explains the terms.
  • Propellers and engine accessories can need overhaul on their own manufacturers' schedules, sometimes before the engine does (Lycoming SI 1009). Check them separately.
  • Check the status of any life-limited parts (91.417(a)(2)(ii)) and anything in an Airworthiness Limitations section, which is mandatory (14 CFR 91.403(c)).

6. The recurring checks

  • ELT (where one is required; 91.207 lists exceptions): inspected within 12 calendar months of the last inspection, with the battery's expiration (replace-by) date marked on the outside of the transmitter and entered in the records (14 CFR 91.207(c) and (d)).
  • Transponder: tested and inspected within the preceding 24 calendar months (14 CFR 91.413).
  • Altimeter and static system: tested within 24 calendar months if you'll fly IFR in controlled airspace (14 CFR 91.411).

7. Do the hours add up?

Follow the times from entry to entry. If a tachometer or Hobbs meter was replaced, the records should show the time in service and the reading at the change; otherwise continuity is lost (AC 43-9D). Unexplained jumps or drops in time deserve a question.

At closing

The seller must transfer the required records to you at the time of sale (14 CFR 91.419). Make a list of every logbook and document you receive, and check that the airworthiness certificate is in the aircraft (14 CFR 91.203). You send the FAA the registration application, the bill of sale (or other evidence of ownership) and the fee. For an aircraft last registered in the U.S., once those are submitted you carry the second copy of the application in the aircraft as temporary authority to operate within the United States until your certificate arrives or the application is denied (14 CFR 47.31).

How GALogbook helps

  • Read the books fast: scan the seller's logbooks with the free iPhone or Android app, and every entry is typed up, with the original page one click away.
  • Ask questions: "When was the prop last overhauled?" gets the answer and the page it came from, instead of an afternoon of reading.
  • ADs and 337s: AD search for the aircraft, engine and prop (appliance ADs need their own search), and every 337 found and filed from the FAA records file.
Buying an airplane? Start the 7-day free trial, scan the seller's logbooks, and ask them the questions above before you write the check.

Get started →   How to digitize logbooks →

Sources